Traffic Growth and Clearance at a Signalised On-Ramp Merge: An LWR Analysis
Brianna Hou
21/11/26
The coincidence of a traffic light and a merging on-ramp is a common feature of urban and highway road design. The single-lane signalised road is a standard example in the study of hyperbolic conservation laws, but the interaction between these two aspects is comparatively underexplored. This paper models this using the Lighthill-Whitham-Richards framework, treating traffic as a continuous fluid whose density evolves according to a first-order hyperbolic partial differential equation. Using the method of characteristics, the Rankine-Hugoniot shock condition, and a rarefaction fan for the green-phase release, closed-form expressions are derived for the maximum traffic jam length and clearance time as functions of traffic light timing and ramp inflow rate.
The model is compared against a cell-transmission (CTM) numerical solution of the underlying conservation law. This comparison confirms the qualitative mechanisms captured by the model, jam growth during red, a two-wave clearance structure during green, and the role of ramp inflow in tightening the stability margin, and agrees quantitatively: for the tested cases the analytic jam length and clearance time lie within about 2% of the simulation. The stability condition is derived from cycle-level vehicle conservation, and the original test parameters are shown to be oversaturated, which the simulation correctly reflects. The paper concludes with an outline of further extensions for continued research.
