The coincidence of a traffic light and a merging on-ramp is a common feature of urban and highway road design. The single-lane signalised road is a standard example in the study of hyperbolic conservation laws, but the interaction between these two aspects is comparatively underexplored. This paper models this using the Lighthill-Whitham-Richards framework, treating traffic as a continuous fluid whose density evolves according to a first-order hyperbolic partial differential equation. Using the method of characteristics, the Rankine-Hugoniot shock condition, and a rarefaction fan for the green-phase release, closed-form expressions are derived for the maximum traffic jam length and clearance time as functions of traffic light timing and ramp inflow rate.

The model is compared against a cell-transmission (CTM) numerical solution of the underlying conservation law. This comparison confirms the qualitative mechanisms captured by the model, jam growth during red, a two-wave clearance structure during green, and the role of ramp inflow in tightening the stability margin, and agrees quantitatively: for the tested cases the analytic jam length and clearance time lie within about 2% of the simulation. The stability condition is derived from cycle-level vehicle conservation, and the original test parameters are shown to be oversaturated, which the simulation correctly reflects. The paper concludes with an outline of further extensions for continued research.

bottom of page